Bilderberg ’63’ Highlights: Global C2 Command & Control System

Bilderberg 2015 C2 System
Share

Bilderberg 2015 C2 System

Bilderberg 2015 C2 System on agenda.

Published  July 1, 2015

This is a quick brief regarding some information on agenda and steering committee chairs at Bilderberg 63. They are moving forward with GeoINT’s total C2 strategy and it appears, as I outlined in my last report, they will have the capability to ration or withhold energy in virtually all forms as well as food production and distribution. Both of these capabilities were specifically addressed in the 2015 GeoINT Symposium in DC that ended on 6.25.2015.

Research Links:
Bilderberg 6.11.2015 Topics
Bilderberg 2015 Overview
Bilderberg 2015 – The Guardian
Ken Jacobs – Lazard Ltd. Lazard History
Lazard 09.08.2014
New American  Bilderberg2015
4 Things We Know About Bilderberg and 1 Thing we’ll Never Know
Bilderberg – Forget the G7 Summit

Bilderberg 2015 C2 System is on the agenda for the 63rd Bilderberg conference. This is a quick brief regarding some information on agenda and steering committee chairs at Bilderberg 63. They are moving forward with GeoINT’s total C2 system strategy and it appears, as I outlined in my last report, they will have the capability to ration or withhold energy in virtually all forms as well as food production and distribution. Both of these capabilities were specifically addressed in the 2015 GeoINT Symposium in DC that ended on 6.25.2015. Bilderberg 2015 C2 System is on the agenda for the 63rd Bilderberg conference. This is a quick brief regarding some information on agenda and steering committee chairs at Bilderberg 63. They are moving forward with GeoINT’s total C2 system strategy and it appears, as I outlined in my last report, they will have the capability to ration or withhold energy in virtually all forms as well as food production and distribution. Both of these capabilities were specifically addressed in the 2015 GeoINT Symposium in DC that ended on 6.25.2015. Bilderberg 2015 C2 System is on the agenda for the 63rd Bilderberg conference. This is a quick brief regarding some information on agenda and steering committee chairs at Bilderberg 63. They are moving forward with GeoINT’s total C2 system strategy and it appears, as I outlined in my last report, they will have the capability to ration or withhold energy in virtually all forms as well as food production and distribution. Both of these capabilities were specifically addressed in the 2015 GeoINT Symposium in DC that ended on 6.25.2015.

From Privacy Product Reviews
A   Level9News Subscription  is required for viewing and submitting comments on this post
Login Here
Share